
FEDERAL SUPPLY SCHEDULE PRICE LIST
CONSOLIDATED PRODUCTS
AND
SERVICES SCHEDULE
Advertising and
Integrated Marketing Solutions (AIMS)
Information Technology
Services (IT)
FSC Class: 541-4B
(Video/Film Production)
541-1000
(Other Direct Costs)
C
D302, C D304 C D306, C D307, C D308, C D310, C D311,
C
D313, C D316, C D317, C D399 (Information Technology)
Contract
Number: GS-00F-0043M
Contract
Period: March
7, 2007 through March 6, 2012
REVISED
– 3/7/07
Contractor: Ferrari Films, Inc.
19530 Broken Fence Way
Monument, CO 80132
Tel: 719-487-1000
Fax: 719-487-0075
E-mail: info@ferrarifilms.com
Contract
Administrator: Denise
Ferrari
Business size: Small
Business, Woman Owned
TABLE OF AWARDED
SPECIAL ITEM NUMBERS (SINs)
C R701 –
Advertising Services
C R708 –
Specialized Marketing Services (Video/Film Production Services)
C
D302 – IT System Development Services
C D304 – IT
Telecommunications and Transmission Services
C D306 – IT
Systems Analysis Services
C D307 –
Automated Information System Design and Integration Services
C D308 –
Programming Services
C D310 – IT
Backup and Security Services
C D311 – IT Data
Conversion Services
C D313 –
Computer Aided Design/Computer Aided Manufacturing Services
C D316 –
Telecommunications Network Management Services
C D317 –
Automated News Services, Data Services, Other Information Services
C D399 – Other
ADP and Telecommunications Services
VIDEO AND FILM PRODUCTION (541-4B)
Ferrari Films, Inc. provides award-winning videotape and film
production services designed to inform the public and Government agencies about
the latest products, services, and/or issues. Ferrari Films services include
but are not limited to writing, directing, shooting, arranging for talent,
narration, music and sound effects, duplication, distribution, video scoring
and editing. The formats used by Ferrari Films include 35mm film, 16mm film,
High Definition video, and Beta SP videotape. The Ferrari Films team has
substantial experience producing educational and training videos, documentaries,
dramatic programs, childrenÕs programs, and commercials.
INFORMATION
TECHNOLOGY (C D302, C D304 C D306, C D307, C D308,
C
D310, C D311, C D313, C D316, C D317, C D399)
The information technology services provided by Ferrari Films and
its subcontractors can be divided into two main categories. Those categories
are:
1. Software and Application Design
One primary service provided by
Ferrari Films is the creation of computer software and application programs,
designed to provide the most powerful interactive technologies available to
military and Government clients.
Specific services provided by Ferrari Films and its subcontractors
include content development, programming, interface design, replication, and
distribution support of these application programs. Software maintenance is
provided on a long-term basis.
2. Web Services
A second key service provided is the design, maintenance and hosting of a variety of websites. These websites provide interactive education, real time communication between users via message boards and email, as well as inventory management and distribution support. An important element of these services is ongoing database management.
ORDERING INSTRUCTIONS, TERMS AND CONDITIONS
1.
Maximum Order: $1,000,000
2.
Minimum Order: $2,500.00
3.
Geographic Coverage (Delivery Area):
Worldwide
4.
Point of Production: Monument, Colorado -
El Paso County
5.
All prices are net
6.
Quantity Discounts: None
7.
Prompt Payment Discount: 1% net 20
8.
Ferrari
Films, Inc. will accept the government commercial credit
card.
9.
Foreign items: N/A
10a. Time of Delivery: Ferrari Films
will adhere to the delivery schedule as specified by the agencyÕs purchase
order.
10b. Expedited Delivery: Contact Ferrari
Films for expedited delivery.
10c.
Overnight and 2-day
Delivery: Contact Ferrari Films for expedited delivery.
11.
FOB Point(s): Destination
12.
Ordering Address: Ferrari Films, Inc., 19530 Broken Fence Way, Monument, Colorado
80132
13.
Payment Address: Ferrari Films, Inc., 19530 Broken Fence Way, Monument, Colorado
80132
14.
Ferrari Films warrants and implies that
the items delivered hereunder are merchantable and fit for the particular
purpose described in this contract.
15.
Export Packing Charges: N/A
16.
Terms and conditions of government
purchase card acceptance:
1% net 20 days
17.
Terms and conditions of rental,
maintenance and repair: N/A
18.
Terms and conditions of installation: N/A
19.
Terms and conditions of repair parts: N/A
20.
List of service and distribution points:
N/A
21.
List of participating dealers: N/A
22.
Preventive maintenance: N/A
23.
Year 2000 (Y2K) compliant: Yes
24.
Environmental attributes: N/A
25. Data
Universal Number System (DUNS): 114482156
26.
Registration in Central Contractor
Registration (CCR) database:
14560648
Prices shown in this section
are net, valid worldwide, and include GSAÕs industrial
funding fee. Hourly labor rates do not include other direct costs (ODCs). An example of ODCs can be found following the price lists for AIMS and IT services.
Price List: CR-701and CR-708
|
Labor Category |
2009 Hourly Rate |
2010 Hourly Rate |
|
Pre-production Planning: Producer |
$78.46 |
$81.20 |
|
Pre-production Planning: Director |
$78.46 |
$81.20 |
|
Pre-production Planning: Writer |
$78.46 |
$81.20 |
|
Pre-production Planning: Researcher |
$54.92 |
$56.84 |
|
Field/Studio Production: Producer |
$78.46 |
$81.20 |
|
Field/Studio Production: Production
Coordinator |
$54.92 |
$56.84 |
|
Field/Studio Production: Director |
$129.69 |
$134.23 |
|
Field/Studio Production: Assistant Director |
$78.46 |
$81.20 |
|
Field/Studio Production: Casting Director/
Facility |
$156.91 |
$162.40 |
|
Field/Studio Production: Production Assistant |
$39.24 |
$40.61 |
|
Field/Studio Production: Camera Operator |
$94.15 |
$97.45 |
|
Field/Studio Production: Asst. Camera Operator |
$70.62 |
$73.09 |
|
Field/Studio Production: Art Director |
$62.77 |
$64.97 |
|
Field/Studio Production: Property Master |
$47.07 |
$48.72 |
|
Field/Studio Production: Gaffer |
$70.62 |
$73.09 |
|
Field/Studio Production: Sound Mixer |
$62.77 |
$64.97 |
|
Field/Studio Production: Boom Operator |
$54.92 |
$56.84 |
|
Field/Studio Production: Electrician |
$54.92 |
$56.84 |
|
Field/Studio Production: Dolly Grip |
$62.77 |
$64.97 |
|
Field/Studio Production: Key Grip |
$54.92 |
$56.84 |
|
Field/Studio Production: Teleprompter Operator |
$54.92 |
$56.84 |
|
Field/Studio Production: Script Supervisor |
$54.92 |
$56.84 |
|
Field/Studio Production: Carpenter |
$39.24 |
$40.61 |
|
Field/Studio Production: Make-up |
$62.77 |
$64.97 |
|
Post Production: Producer |
$78.46 |
$81.20 |
|
Post Production: Director |
$78.46 |
$81.20 |
|
Post Production: Editor |
$70.62 |
$73.09 |
|
Post Production: Assistant Editor |
$54.92 |
$56.84 |
|
Post Production: Graphic Designer |
$94.15 |
$97.45 |
|
Post Production: Offline Editor |
$54.92 |
$56.84 |
|
Post Production: Transcriber |
$39.24 |
$40.61 |
|
Post Production: Narrator |
$635.47 |
$657.71 |
|
Post Production: Narration Recording Studio |
$188.30 |
$194.89 |
PRICE
LISTS: 2009 - 2010
Prices shown in this section are net, valid worldwide, and include GSAÕs industrial funding fee. Hourly labor rates do not include other direct costs (ODCs). An example of ODCs can be found at the end of this section.
Price Lists: C D302, C D304 C D306, C D307, C D308,
C D310, C D311, C D313, C
D316, C D317, C D399
|
Labor Category |
2009 Hourly Rate |
2010 Hourly Rate |
|
Programmer
- Level 1 |
$80.29 |
$83.10 |
|
Programmer
- Level 2 |
$137.22 |
$142.03 |
|
Programmer
- Level 3 |
$185.04 |
$191.52 |
|
Multimedia
Developer - Level 1 |
$103.65 |
$107.28 |
|
Multimedia
Developer - Level 2 |
$126.29 |
$130.71 |
|
Multimedia
Developer - Level 3 |
$163.51 |
$169.23 |
|
Sound
Effects Specialist |
$108.40 |
$112.19 |
|
Flash
Developer - Level 1 |
$143.07 |
$148.08 |
|
Flash
Developer - Level 2 |
$175.19 |
$181.32 |
|
Flash
Developer - Level 3 |
$235.05 |
$243.27 |
|
Administrative
Assistant |
$34.60 |
$35.81 |
|
Production
Assistant |
$52.13 |
$53.95 |
|
Project
Manager |
$110.07 |
$113.92 |
|
Information
Architect |
$126.83 |
$131.27 |
|
Production
Artist |
$89.38 |
$92.51 |
|
Art
Director |
$158.28 |
$163.82 |
|
Assistant
Art Director |
$91.17 |
$94.36 |
|
3D
Animator |
$158.27 |
$163.81 |
|
Technical
Project Lead |
$157.14 |
$162.64 |
OTHER DIRECT COSTS
(541-1000)
The
ODCs listed below are hourly rates, unless otherwise noted.
-
Studio: $121.90
-
Camera Equipment: $121.90
-
Sound Equipment: $48.75
-
Lighting Equipment: $243.81
-
Grip Rental: $121.90
-
TelePrompTer Rental: $42.66
-
Video Tape Stock: $73.15
-
Union Actor(s): $730.42/day
-
Nonunion Actor(s): $548.63/day
-
Catering: $24.94/person/day
-
Window Dub Transferring: $54.86
-
Non-Linear Editing (Digital): $121.90
-
Sound Studio: $146.08
-
Special Graphic Effects: $121.90
-
Special Sound Effects: $67.05
-
Music Selection: $201.50
-
Original Music Composition: $403.00
-
Narrator: $493.70
-
Narration Recording Studio: $146.08
-
Digitizing Original Tape: $42.66
-
Closed Captioning: $151.12
- Duplication: $54.86
1. Staff – in keeping with the
industry standards of the Information Technology and Film/Video production
field, Ferrari Films, Inc. hires
staff members based upon 3 elements:
A.
Level of skill and
training as evidenced by a sample production reel (where applicable)
B.
Level of skill and
training as evidenced by samples of written code, authored programs (where
applicable)
C.
Professional references
from past and current production company clients
D.
Attitude
2. Contract Labor – in keeping with
the industry standards of the Information Technology and Film/Video production
field, Ferrari Films, Inc. hires
subcontractors based upon 3 elements:
A.
Level of skill and
training as evidenced by a sample production reel (where applicable)
B.
Level of skill and
training as evidenced by samples of written code or authored programs (where
applicable)
C.
Professional references
from past and current production company clients
D.
Attitude

Thank you!